Facilities & Capacity

Facilities

Facilities

  • 8200 m² of total area
  • 7500 m² of production area
  • 700 m² of office space
  • Design Center
  • Metrology Laboratory
  • NDT / Non-Destructive Testing Laboratory
  • Metallography Laboratory
  • Spectrometric Analysis Laboratory
  • Mechanical Testing Laboratory
Capacity

Capacity

  • 2 double crucible induction furnaces with melting capacity of 2 x 150 kg.  (175 tons/month steel)         
  • 1 aluminum melting furnace with 500 kg and 1 with 300 kg capacity (35 tons/month)
  • 1 aluminum T6 heat treatment furnace with 500 kg loading and 900 x 1500 x 900 millimeter size capacity (between 100 - 550 °C, ± 5 °C precision)